Services

Dr Wendy Dyke, Morda Road, Oswestry

Project: Complete removal of a poorly installed loft conversion. This project involved installing the correct size floor supports then the installation of a new floor plan to include a large lounge, kitchen, bathroom, two bedrooms, complete rewiring of both the loft and first floor and new central heating through to new complete re plastering. We also created a new ensuite bathroom and fitted bedroom units in the master bedroom on the first floor.

"After an initial visit to our home Steve guided us through what would be involved with our project. The original installation was near collapse into the existing first floor. It is fair to say nothing the original builders had done was suitable and all had to be removed.

After moving out for six weeks the major work was completed to a high standard. We now have a house that has been transformed and has a separate living area in the loft. We are very pleased with everything Steve and his team have done for us and would recommend CPR highly".

Mrs Thomas, Greyfriars, Oswestry

Project: Complete refurbishment of a 3 bedroom bungalow, to include a new kitchen, bathroom, rewiring, central heating, complete re plastering throughout and a new ensuite / bedroom unit installation in the master bedroom as well as new landscaping and drive.

I would like to thank Steve and his team at CPR for our new home. Everything was done to exactly what we required and the finish is fantastic. I now live in a show home and cannot recommend them enough.

Mr Lee Knapman, Handbridge, Chester

Project, Complete refurbishment of a two bedroom semi detached house, to include complete back to brick start, designer bathroom and kitchen, complete rewire, complete central heating installation, complete re plastering and bespoke joinery.

As a first time homeowner and keen diy'er, I was enticed by the idea of renovating my property. But after a few months and a lot of school boy errors I decided to get some help. ? Hiring Steve to project manage and complete the renovation, made what started off a very stressful experience a more enjoyable one.. Steve was incredibly helpful, a pleasure to work with. But most importantly he is someone I could trust to deliver exactly what I wanted, with an excellent degree of quality.

Mr & Mrs Williams, Upton Chester

Project: Remodelling of bathroom which included internal alterations to facilitate the installation of an additional shower area within the existing bathroom design.

"We are both extremely pleased with the work you have carried out and with the standard of your workmanship. We now have a modern bathroom which has the wow factor we wanted. Thanks again - we would certainly recommend you to friends and family".

Dr & Mrs Bloyce, Hallows Drive, Kelsall

Project: Removal of a poorly installed bathroom then alterations to include a separate shower cubicle bath, wall hung basin and toilet, fully tiled walls and floor.

"Steve and his team provide an excellent service. The attention to detail, the flexibility on the job, the friendliness, workmanship and attention to detail were all second to none. We would not hesitate to recommend Steve and his team, nor should the time come, to employ them again"!

Mr & Mrs Williams, Bangor

Project: Remodelling of bathroom which involved removal / alterations of walls to enlarge room, suite change, fully tiled which also included under floor heating. We also installed the latest bathroom music system.

We would not hesitate to recommend Steve to carry out bathroom or kitchen renovations. He helped us to plan the entire bathroom refurbishment, we have been very impressed with his professional approach to the job, and we are thrilled with our new bathroom.

Mr & Mrs Lawson, Chatsworth Drive, Newton Chester

Project: Full refurbishment of bathroom

"Excellent communication between Steve and myself always kept me updated on what was happening at each stage of the project. He explained in detail what would happen how long it would take and why.

Excellent advice given all throughout project. Very professional and friendly.

Would highly recommend Complete Property Renovations".

Mr & Mrs Nicholls, Chester

Project: Remodelling of bathroom which involved removal / alterations of walls, create a corridor to facilitate the installation of a new external door, suite change, with the addition of a new shower area fully tiled and installation of a sound system to new bathroom and dining room.

Efficient and timely installation of our new bathroom. Fabulous transformation! Thank you

Mr Shyam Kumar Consultant Orthopaedic Surgeon, Lancaster

Project: Refurbishment of two bedroom holiday flat in Colwyn Bay to include a new bathroom, part rewiring, plastering, complete decoration and removal of the old warm heating system.

"My wife and are so pleased with the finished project as Steve and his team have transformed our 1970s holiday flat to a modern finish. As we live in the North of England we only actually met once. He kept us updated at all times and sent through extensive photographs of what had been done. He even organised for new carpets to be fitted throughout. We cannot speak highly enough of what he has done for us, many thanks!"

Dr Wendy Dyke, Sealand Road, Chester

Project: Refurbishment of two bedroom semi detached house, to include improvements to the loft conversion, installation of new doorways, complete rewiring and re plastering.

"Again we are very pleased with the work that has been done for us. We bought this property in a very run down state and Steve and his team have transformed it into a very comfortable home".

We will be using Steve and his team again".

Mr & Mrs Paige, Greyfriars, Oswestry

Project: Full refurbishment of bathroom to shower room

"Steve led us through ever step from design to installation as this was the first time we have undertaken such a project. The finished bathroom is incredible as we were sceptical what was possible in such a small space!

As pensioners what was most pleasing was that the price quoted at the start, was the price we paid!! We cannot recommend Steve and his team highly enough".

Mr & Mrs Sumner, Hoole Lane, Hoole Chester

Project removal of poorly installed shower room, which involved going completely back to brick as there were extensive damp and drainage issues with the original installation.

"Thanks Steve for rescuing our bathroom. Due to shoddy work done by previous builders we had a real problem bathroom. Steve identified the problems and corrected them. I was really impressed with the quality of his work, the best way I can describe it is that he does as good a job as you would yourself, if only you had the skills and the tools. I'll certainly be recommending him to friends and family".

Dr Wendy Dyke, Church Street, Oswestry

Project: Conversion of a dentist surgery to part living and part commercial use. This has involved part rewiring and construction then installation of a new kitchen and shower room as well as extensive shop fitting. We also completed a significant amount of structural work due to settlement of the building.

"This is the third time Steve and his team have completed a large project for us, and once again he has delivered what we needed.

The best thing about CPR is that they not only complete major projects to a high standard but are quite happy to complete minor maintenance work as well. We will continue to use them again and again".